100 Years Clifford Buck Logo

warehouses

cbc

Busche Aluminum Technology

This project had three phases: the 63,071 sq ft manufacturing phase addition, the 3,367 sq ft office phase addition, and the 1,094 sq ft receiving addition phase. The manufacturing addition was a new PEMB furnished by Nucor and included six new loading docks. The Office addition featured a new main entrance with an expanded break Room, a new lobby, a training Room, a conference Room, and locker rooms. The new Receiving area included three new interior offices and parts storage for maintenance.

0
Square feet

Project Type

New Building

Architect

BMA Architects

Completed

2018

Consumers Energy

Ludington Pumped Storage Plant

 This project included two phases for the South and North Fabrication shops. It included: 

  • A sliding bi-parting doors
  • A insulated metal roof panel and wall panel system
  • Removable structural steel roof hatch
  • Overhead bridge crane
0
Square feet

by

0
Square feet

Project Type

New Building

Architect

Black and Veetch

Completed

2013

Howmet Alcoa Plants 3&4

This project consisted of two phases: Howmet Plant 3 and Howmet Plant 4. Both had unique challenges. Plant 3 needed to stay open during construction and Plant 4 required a large furnace pit that needed to be constructed before any foundation could be laid. Plant 3’s project scope included rerouting existing sewer lines, interior demolition, new loading docks, and new office space. Plant 4’s project scope included the installation of a 5-ton bridge crane and creation of a staging area, breakroom, technician room, and mezzanine.

0
Square feet
by
0
Square feet

Project Type

Expansion

Architect

Dimensions in Architecture

Completed

2015